Bharat Metro Locator pulls data directly from Uttar Pradesh Metro Rail Corporation’s (UPMRC) GTFS feed and crowdsourced rider reports, ensuring accurate Agra Metro timings, fares, and station details updated nightly.
Comprehensive coverage of all lines (2025)
The Yellow Line (Sikandra to Taj East Gate, 14.25 km) has 6 operational stations (Taj East Gate to Mankameshwar, 5.2 km) with 14 stations planned (6.569 km elevated, 7.681 km underground). The Blue Line (Agra Cantt to Kalindi Vihar, 15.4 km, all elevated) is under construction with 15 stations, expected by 2026. Mankameshwar will serve as the interchange station.
Smart route planner
Enter your source and destination to get multiple route options ranked by travel time, interchanges, and walking distance, with a detailed Agra Metro ticket price breakdown. Use the flip arrow in the route planner to quickly check return trains (e.g., from Taj East Gate to Mankameshwar and back).
Fare calculator & smart cards
Our fare calculator includes single journey fares (INR 10–30), smart card discounts, and QR code tickets. Recharge smart cards via the Agra Metro app, UPMRC website, or ticket vending machines. Children below 90 cm travel free with an adult.
Agra Metro at a glance (2025)
- Total route length: 5.2 km operational (Yellow Line), 29.65 km planned (Phase 1)
- Daily ridership: ~8,000 passengers (April 2025 average, ~2.5 lakh monthly)
- Key feature: Third rail system for efficient operations
- Major interchange: Mankameshwar (Yellow and Blue Lines)
Agra Metro expansion updates
Yellow Line testing from RBS College to SN Medical College is ongoing, with completion expected by April 2025. Underground tunneling from Khandari Chauraha to SN Medical College is in progress, with Bijlighar Chauraha tunneling set to finish by September 2025. Blue Line construction (Agra Cantt to Kalindi Vihar) is on track for 2026 completion, with all 15 stations elevated.