How to use this Pune Metro guide
This Pune guide organises the station list, corridor details and fare references maintained in Bharat Metro Locator. Confirm current timings, ticket rules and service changes with Maha Metro.
Operational lines and expansion notes
The Purple Line (PCMC to Swargate, 17.4 km, 14 stations: 9 elevated, 5 underground) and Aqua Line (Vanaz to Ramwadi, 15.7 km, 16 stations, all elevated) are fully operational. Line 3 (Hinjawadi to District Court, 23.3 km, 23 stations, all elevated) is under construction, with partial opening planned for September 2025. Civil Court and District Court serve as interchange stations.
Choose a route that fits your trip
Enter your source and destination to get multiple route options ranked by travel time, interchanges, and walking distance, with a detailed Pune Metro ticket price breakdown. Use the flip arrow in the route planner to quickly check return trains (e.g., from PCMC to Swargate and back).
Fare and card options
The configured Pune fare notes cover single journeys of INR 10–35, One Pune NCMC RuPay Card discounts and QR-ticket guidance. The listed daily-pass reference is INR 100 for travel from 6:00 AM to 10:00 PM; verify price and validity with Maha Metro.
Pune Metro at a glance (2025)
- Total route length: 33.1 km operational (Purple and Aqua Lines), 66.27 km planned (Phase 1)
- Daily ridership: ~1.5 lakh passengers (April 2025 average)
- Key feature: Lightest metro in India with aluminium coaches
- Major interchange: Civil Court (Purple and Aqua Lines), District Court (Purple and Line 3)
Pune Metro expansion updates
Purple Line extensions: PCMC to Nigdi (4.413 km, 4 elevated stations) and Swargate to Katraj (5.46 km, 4 underground stations) are under construction, targeting completion by 2025 and February 2029, respectively. Line 3 (Hinjawadi to District Court) is 87% complete, with trial runs at 40 km/h and partial opening planned for September 2025. Phase 2 plans include new corridors to Katraj, Chandni Chowk, Kharadi, and Hadapsar.

