Why trust our Jaipur Metro map?
Bharat Metro Locator pulls data directly from Jaipur Metro Rail Corporation’s (JMRC) GTFS feed and crowdsourced rider reports, ensuring accurate Jaipur Metro timings, fares, and station details updated nightly.
Comprehensive coverage of all lines (2025)
The Pink Line (Mansarovar to Badi Chaupar, 12.07 km) is fully operational with 11 stations (8 elevated, 3 underground). Phase 1C (Badi Chaupar to Transport Nagar, 3.41 km) is under construction, expected by August 2025. Phase 1D (Mansarovar to Ajmer Road, 1.31 km) is set for December 2025. The Orange Line (Phase 2, Ambabari to Sitapura, 23.51 km) is planned with construction starting mid-2025, targeting 2028 completion. Chandpole will serve as the interchange station.
Smart route planner
Enter your source and destination to get multiple route options ranked by travel time, interchanges, and walking distance, with a detailed Jaipur Metro ticket price breakdown. Use the flip arrow in the route planner to quickly check return trains (e.g., from Mansarovar to Badi Chaupar and back).
Fare calculator & smart cards
Our fare calculator includes single journey tokens (INR 6–18), smart cards (10–15% discount), and tourist cards (INR 100 for 1-day, INR 200 for 3-day, including INR 50 refundable deposit). Smart card recharges are available via the JMRC website or at station kiosks.
Jaipur Metro at a glance (2025)
- Total route length: 12.07 km operational (Pink Line), 28.27 km proposed/under construction (Phases 1C, 1D, and 2)
- Daily ridership: ~0.75 lakh passengers (April 2025 average)
- Key feature: India’s first triple-storey elevated structure (road, flyover, metro track)
- Major interchange: Chandpole (planned for Pink and Orange Lines)
Jaipur Metro expansion updates
Phase 1C (3.41 km, Badi Chaupar to Transport Nagar) is underway with tunneling started, targeting August 2025. Phase 1D (1.31 km, Mansarovar to Ajmer Road) is expected by December 2025. Phase 2 (Orange Line, 23.51 km, 21 stations) has INR 12,000 crore allocated, with construction starting mid-2025 and completion by 2028. A proposed Blue Line to Jaipur International Airport is under feasibility study.