Route overview
The MBTA Subway journey from Beaconsfield to Chestnut Hill is a direct journey with no line change. It covers approximately 2 km in 4 minutes across 3 stations.
MBTA Subway timings and fare
Transit fares, passes and concessions vary by agency and payment method. Confirm the current fare with the official operator.
Station-by-station route
- 1Beaconsfield#00843D Line
Next: Mbta Rapid Reservoir 0 · 1 min
- 2Reservoir#00843D Line
Next: Mbta Rapid Chestnut Hill 0 · 3 min
- 3Chestnut Hill#00843D Line
Terminal station
Travel tips
- Check operator service notices before travelling.
- Keep extra time for interchange walking and platform changes.
- Use the route planner above to compare the available route options.
Frequently asked questions
How many stations are between Beaconsfield and Chestnut Hill?
There are 3 stations on this route, covering approximately 2 km.
How long does Beaconsfield to Chestnut Hill take?
The estimated journey time is 4 minutes under normal operating conditions.
What is the MBTA Subway fare for this route?
$2.40 standard · $1.10 reduced Confirm the current fare before travelling.
What are the first and last MBTA Subway trains?
The available timing reference is Check operator for the first train and Check operator for the last train. Check the operator for the exact service-day schedule.
What facilities are available at Beaconsfield?
Beaconsfield facility details are not published in the current network snapshot; confirm station services locally.